Sitewide

2018:

The British Geological Survey (“BGS”) has submitted a planning application to Cheshire West and Chester Council for the Cheshire Energy Research Field Site

The proposed development consists of a network of 14 sites with 50 boreholes and associated above ground infrastructure, plus a Main Telemetry Mast site. The boreholes would facilitate observation of, and research into, the subsurface environment and would contain scientific instrumentation for monitoring and observation.

7 of these sites are on land which is owned by Peel Land and Property either on the consented Protos (previously named Ince Resource Recovery Park) or on land just on its periphery. These are Sites, A, B, C, F, K, L, and N.

Site A location plan

Site B location plan

Site C location plan

Site F location plan

Site K location plan

Site L location plan

Site N – technical issue with uploading this plan.

This application has been prepared and submitted by BGS. The full planning application can be accessed at https://pa.cheshirewestandchester.gov.uk/online-applications/applicationDetails.do?keyVal=PK1JTGTEKQD00&activeTab=summar

 

Consents:

Resource Recovery Park Consent

Resource Recovery Park Section 73 Consent

Access Road Consent